| Sign In | Join Free | My ledscreensign.com |
|
| Brand Name: DELLOK Yonghui | Certification: CE |
| Model Number: Air Cooler Heat Exchanger | Minimum Order Quantity: 1 set |
| Delivery Time: 1-3weeks | Payment Terms: T/T, L/C, D/A, D/P, Western Union, MoneyGram |
| Dellok Yonghui Radiating Pipe Manufacturing Co.,Ltd. [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: YUHONG | Certification: ASME , U STAMP , PED, API , ABS, LR, DNV, GL , BV, KR, TS, CCS |
| Model Number: E05C, ASME SA179 Carbon Steel Seamless Tube with ASME SA266 Gr.2N Tubesheet | Minimum Order Quantity: 1Set |
| Delivery Time: 45---150 DAYS | Payment Terms: L/C, T/T |
| Yuhong Group Co.,Ltd [Zhejiang,China] | |
| Verified Supplier | |
| Brand Name: Yuhong | Certification: ABS, BV, DNV, CCS, LR |
| Model Number: G Fin tube , Embedded Fin tube , Embedded G type fin tube | Minimum Order Quantity: 1 PC |
| Delivery Time: 5 - 90 Days | Payment Terms: TT, LC |
| YUHONG HOLDING GROUP CO., LTD [China] | |
| Verified Supplier | |
| Brand Name: YUHONG | Certification: ABS, DNV-GL, LR, BV, CCS, KR, ASME, TUV, SGS, BV, IEI, IBR, ISO9001, ISO 14001, ISO 18001 |
| Model Number: G Fin tube , Embedded Fin tube , Embedded G type fin tube | Minimum Order Quantity: 1 PC |
| Delivery Time: 5 - 90 Days | Payment Terms: L/C, T/T |
| YUHONG HOLDING GROUP CO., LTD [China] | |
| Verified Supplier | |
| Brand Name: YUHONG | Certification: API 661, ASME SECTION VIII, PED 97/23/EC, EN13445, PED/2014/68/EU AD 2000 |
| Model Number: Boiler Feed Water | Minimum Order Quantity: 1 Set |
| Delivery Time: 45---150 DAYS | Payment Terms: L/C, T/T |
| YUHONG HOLDING GROUP CO., LTD [China] | |
| Verified Supplier | |
| Brand Name: YUHONG | Certification: ASME, PED, API , ABS, LR, DNV, GL , BV, KR, TS, CCS |
| Model Number: Wound Fin Tube , L Type fin tube | Minimum Order Quantity: 1PC |
| Delivery Time: 5 - 30 Days | Payment Terms: L/C,T/T |
| YUHONG HOLDING GROUP CO., LTD [China] | |
| Verified Supplier | |
| Brand Name: TORICH | Certification: ISO9001, ISO14001, TS16949 |
| Model Number: ASME SA179 | Minimum Order Quantity: 5Tons |
| Delivery Time: 30-45 work days | Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| TORICH INTERNATIONAL LIMITED [Zhejiang,China] | |
| Verified Supplier | |
| Brand Name: Reliance | Certification: CE,ISO... |
| Model Number: U Tube | Minimum Order Quantity: N/A |
| Delivery Time: Ex-work within 1 month on receipt of order. | Payment Terms: T/T, L/C |
| JIANGSU RELIANCE THERMAL EQUIPMENT CO., LTD [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: HUGECOOL | Certification: Other, CE |
| Minimum Order Quantity: 1 Unit/Units | Place of Origin: Shandong, China (Mainland) |
| Price: $200.00 - $1,000.00 / Units | Supply Ability: 300 Set/Sets per Month evaporative air cooler |
| Hugecool (Qingdao) Refrigeration Techonolgy Co., Ltd [Shandong,China] | |
| Verified Supplier | |
| Brand Name: HD BOILER | Certification: ISO9001 , SGS , TUV , ASME , EN |
| Model Number: Furnace wall | Minimum Order Quantity: 1 Set |
| Delivery Time: 50 Days | Payment Terms: Western Union, L/C, T/T |
| Zhangjiagang HuaDong Boiler Co., Ltd. [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: HDT | Certification: ISO9001,ASME,Grade A,SGS,EN,TUV |
| Model Number: Boiler Fin Tube | Minimum Order Quantity: 5T |
| Delivery Time: 60-75days | Payment Terms: L/C, T/T, Western Union |
| ZHANGJIAGANG HUA DONG ENERGY TECHNOLOGY CO.,LTD [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: Damai | Certification: CE;ISO |
| Model Number: DM-DV | Minimum Order Quantity: 1 |
| Delivery Time: 15 Work Days | Payment Terms: T/T |
| Zhejiang Damai Cold Chain Equipment Co., Ltd. [Zhejiang,China] | |
| Verified Supplier | |
| Brand Name: Yushun | Certification: ISO 9001 |
| Model Number: Customized | Minimum Order Quantity: 1 set |
| Delivery Time: 30 days | Payment Terms: L/C, T/T |
| Wuxi Yushun Metallurgical Technology Co., Ltd. [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: SAT-CHAM | Certification: ISO CE |
| Model Number: Spiral fin tube | Minimum Order Quantity: 1 Set |
| Delivery Time: 30 Days | Payment Terms: L/C, T/T, Western Union |
| Jiangsu Sat-Cham Energy Technology Co., Ltd. [China] | |
| Verified Supplier | |
| Certification: BSI | Minimum Order Quantity: negotiable |
| Place of Origin: Zhejiang, China (Mainland) | Price: negotiable |
| Standard: ASTM | Grade: 10#, 20#, 45# |
| TORICH INTERNATIONAL LIMITED [Zhejiang,China] | |
| Verified Supplier | |
| Brand Name: OEM/ODM | Certification: CE,ROHS ,ISO9001,ISO14001, |
| Model Number: Customized | Minimum Order Quantity: Negotiable |
| Delivery Time: 3-15 days for 1-5 sets | Payment Terms: L/C, T/T |
| Changzhou Aidear Refrigeration Technology Co., Ltd. [Jiangsu,China] | |
| Active Member | |
| Brand Name: Yun Neng | Certification: ISO9001 ISO14001 ISO45001 |
| Model Number: 1050A | Minimum Order Quantity: 3 tons |
| Delivery Time: 30 working days after received your down payment | Payment Terms: T/T |
| Jiangsu Yunneng Precision Technology Co., Ltd [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: Gnee | Certification: ISO |
| Minimum Order Quantity: 1 | Delivery Time: 15days |
| Payment Terms: T/T,L/C,Paypal,Alipay,West Union and so on | Place of Origin: henan |
| Henan Gnee New Materials Co., Ltd. [Henan,China] | |
| Verified Supplier | |